
Configuration
Verilink SCC 2020 User Manual
3
-23
1. Place the download file received from Verilink in a known path
on an FTP server.
2. Connect to the SCC 2020 directly or using Telnet.
3. At the
pSH+>
pSH+>pSH+>
pSH+>
prompt, issue the command to connect to the
FTP server, “
FTP 192.94.45.229
”
(use the IP address of your
FTP server).
4. Navigate to the directory where the Verilink upgrade file is
located by using the “
cd”
command.
5. Set the transfer type to binary by typing “
binary”.
6. Transfer the file to the SCC 2020 by typing “
get myfile.ext”
(use
the actual name of the file received from Verilink).
7. Now end the FTP session by typing “
quit”.
8. At the
pSH+>
pSH+>pSH+>
pSH+>
prompt, type “
craft”
to enter the Craft interface.
9. Type “
O
” for the
Node Administration Menu
.
10. Type “
Y
” for the
Element Download Menu
.
The
Element Download Menu
is shown in Figure 3-7. The
commands presented are documented in Table 3-7
Figure 3-7 Element Download Menu
The commands used on the
Element Download Menu
will vary
according to:
•
The type of application module(s) you are upgrading.
•
The name of the file provided for the upgrade.
•
The shelf and slot location of the module(s).
•
Whether the module to be upgraded resides in the local node
or a remote location.
NOTE:
For remote upgrade to work, the locations must be connected
with a T1 which has ESF framing and an uninterrupted
Facilities Data Link (FDL). In very many cases the T1 will be
---- element download ----
---- element download ---- ---- element download ----
---- element download ----
T) element : ----
T) element : ---- T) element : ----
T) element : ----
F) file :
F) file : F) file :
F) file :
S) shelf : 0 - 0
S) shelf : 0 - 0 S) shelf : 0 - 0
S) shelf : 0 - 0
L) slot : 0 - 0
L) slot : 0 - 0 L) slot : 0 - 0
L) slot : 0 - 0
D) dwnload
D) dwnload D) dwnload
D) dwnload
X) exit menu
X) exit menu X) exit menu
X) exit menu
[1,1] NEAR TAC 2010 >
[1,1] NEAR TAC 2010 >[1,1] NEAR TAC 2010 >
[1,1] NEAR TAC 2010 >
Kommentare zu diesen Handbüchern