Hardware Installation
4-16 Verilink Access System 2000: The Basics
3. Measure the +5 VDC output on the front panel of the power
supply between the test points labeled, +5V and +5 RTN
(return). The reading must be +5.5 VDC, ±0.055 VDC. If the
reading is out of tolerance, replace the power supply.
4. Repeat steps 1 through 3 for the second power supply.
Kommentare zu diesen Handbüchern