Verilink 2010 (34-00204) Product Manual Bedienungsanleitung Seite 1

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Computerhardware Verilink 2010 (34-00204) Product Manual herunter. Verilink 2010 (34-00204) Product Manual User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - 1st Edition, Rev 1.02

TRANSPORT®IntroductionReference Manual34-00204 1st Edition, Rev 1.02 2010ESFCSU

Seite 2 - Table of Contents

Installation 2-32010 CSUS2-6: This position enables the sending of an alarm indi-cation signal (AIS) during an active payload loopback. Theunit can be

Seite 3 - Copyright/liability

2-4 Installation 2010 CSU2.6 DTE ConnectionThe DTE connection is provided on the rear panel (refer toFigure 2-2 on page 2-3). The equipment side DTE

Seite 4 - 1.1 Specifications

Operation 3-12010 CSUOperation3.0 IntroductionThis chapter describes the front panel operation and test fea-tures of the TxPORT 2010 ESF CSU. These co

Seite 5 - 1.2 FCC Requirements

3-2 Operation 2010 CSUfollowing conditions from the DTE: one or more BPVs,FBEs, CRCs, a yellow alarm, low ones density, or loss ofsignal/loss of sync

Seite 6 - 1.5 TxPORT Customer Service

Operation 3-32010 CSUgraphs. The reference manual supplied with the TxPORTproduct should be consulted for the interface systemdescription. The ‘Perfor

Seite 7 - 1.6 Ordering Numbers

3-4 Operation 2010 CSUtotals for the last 24-hour period (or the last 96 fifteen-minute intervals). The remaining lines of this screen show the data

Seite 8 - Installation

GeneralIntroduction ... 1-1Specifications ...

Seite 9

Copyright © 1995 TxPORT, All rights reserved. No part of this publication may be reproduced, trans-mitted, transcribed, stored in a retrieval system,

Seite 10

General 1-12010 CSUGeneral1.0 Introduction The TxPORT 2010 ESF CSU provides an economical solu-tion for interfacing a metallic T1 facility to customer

Seite 11 - 2.9 Power Connection

1-2 General 2010 CSUEquipment InterfaceLine Rate: 1.544 Mb/s (±50 bps) Line Framing: D4 or ESFLine Code: AMI or B8ZSLine Impedance: balanced 100 Ω (±

Seite 12 - Operation

General 1-32010 CSUphone line. If your equipment needs repair, it should not bereconnected until it is repaired. 4) The unit has been designed to prev

Seite 13 - 3.2 Front Panel Testing

1-4 General 2010 CSU1.6 Ordering Numbers The unit is shipped from the factory with the 2010 CSUreference manual. Refer to Table 1-2 on page 4 for the

Seite 14

Installation 2-12010 CSUInstallation2.0 IntroductionThis chapter contains information and instructions requiredto prepare the TxPORT 2010 ESF CSU for

Seite 15

2-2 Installation 2010 CSU2.5.1 Configuration Switch S1 Front panel Switch S1 provides the following configurationparameters. S1-1: This switch positi

Kommentare zu diesen Handbüchern

Keine Kommentare